| MOQ: | 1 |
| Price: | negotiable |
| Standard Packaging: | Wooden case packing |
| Delivery Period: | 5-8weeks |
| Payment Method: | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
| Supply Capacity: | Peak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months |
![]()
The equipment features an integrated structure, standardized design, modular production, and a high - level of integration. It allows for overall inspection and testing before leaving the factory, and can be put into operation simply by connecting to power and pipes.
![]()
![]()
![]()
![]()
![]()
|
|
| MOQ: | 1 |
| Price: | negotiable |
| Standard Packaging: | Wooden case packing |
| Delivery Period: | 5-8weeks |
| Payment Method: | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
| Supply Capacity: | Peak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months |
![]()
The equipment features an integrated structure, standardized design, modular production, and a high - level of integration. It allows for overall inspection and testing before leaving the factory, and can be put into operation simply by connecting to power and pipes.
![]()
![]()
![]()
![]()
![]()