| MOQ: | 1 |
| Cena £: | Zbywalny |
| standardowe opakowanie: | drewniane pudełko |
| Okres dostawy: | 5-8 dni roboczych |
| metoda płatności: | L/C, D/A, D/P, T/T, Western Union |
| Pojemność dostaw: | 100 |
| Parameter | Specification Range |
|---|---|
| Working Pressure | 1.6-2.0MPa (conventional models), higher pressure options available |
| Operating Temperature | -50°C to 180°C (dependent on gasket materials) |
| Heat Transfer Coefficient | 2000-6000 W/(m·°C) - significantly higher than shell and tube equipment |
| Installation | Horizontal/vertical installation supported for flexible workshop layout |
| MOQ: | 1 |
| Cena £: | Zbywalny |
| standardowe opakowanie: | drewniane pudełko |
| Okres dostawy: | 5-8 dni roboczych |
| metoda płatności: | L/C, D/A, D/P, T/T, Western Union |
| Pojemność dostaw: | 100 |
| Parameter | Specification Range |
|---|---|
| Working Pressure | 1.6-2.0MPa (conventional models), higher pressure options available |
| Operating Temperature | -50°C to 180°C (dependent on gasket materials) |
| Heat Transfer Coefficient | 2000-6000 W/(m·°C) - significantly higher than shell and tube equipment |
| Installation | Horizontal/vertical installation supported for flexible workshop layout |